Our first year catskiing is over. We had a great year exploring our terrain and entertaining guests.

Over the winter work slowed on the exterior of Keefer Lake Lodge but we have been going full bore on the interior.

With the snow receding and the lake breaking up we are all hands on deck and working to get the lodge complete for the start of catskiing 2016/2017.

Some highlights include a working elevator to get between floors, most wood work is in, and floors are all poured.

Here are some recent photos of how the lodge is progressing.

keefer-lake-lodge-build-160404-16-1030x686
keefer-lake-lodge-build-160404-17-1030x686
keefer-lake-lodge-build-160404-18-1030x686
keefer-lake-lodge-build-160404-19-1030x686
keefer-lake-lodge-build-160404-21-1030x686
keefer-lake-lodge-build-160404-22-1030x686
keefer-lake-lodge-build-160404-23-1030x686
keefer-lake-lodge-build-160404-24-1030x686
keefer-lake-lodge-build-160404-25-686x1030
keefer-lake-lodge-build-160404-26-1030x686
keefer-lake-lodge-build-160404-27-1030x686
keefer-lake-lodge-build-160404-28-1030x686
keefer-lake-lodge-build-160404-37-1030x686
keefer-lake-lodge-build-160404-38-1030x686
keefer-lake-lodge-build-160404-40-1030x686
keefer-lake-lodge-build-160404-41-1030x686
keefer-lake-lodge-build-160404-42-1030x686
keefer-lake-lodge-build-160404-43-1030x686